Memphis overhauls aging sewer system to support economic growth

The City of Memphis

Memphis, TN

The City of Memphis, TN was ordered to modernize its aging sewer system after it leaked sewage into waterways and homes. Through its 10-year Sewer Assessment and Rehabilitation Program, the city is building a modern sewer network that supports future development and economic growth.

Topics Covered

Waste Management
Asset Management
Process Improvement

Funding

Bonds & Loans

Utility rates

Project Status

In Progress/Under Construction since 2013

Gov Champion

Department of Public Works

Problem Addressed

Health and environmental impacts from sewer overflows led the City of Memphis' to plan an update of its aging sewer system to support the city's future growth and development.

The scale of the project led the city to find a partner to keep the massive project on track and in compliance.

Memphis, TN has 3,200 miles of sewer system just below its many streets and homes, a distance equivalent to that between the cities of Seattle and Miami. In a given year, the system treats about 60M gallons of wastewater to support the city's growing population of over 650,000.

Construction of the system began in the 1870s, meaning some pipes are over a century old. Over time, the aging infrastructure started to deteriorate and began to leak untreated sewage into yards, streets, homes, and streams. Because of the scale of the sewer system, it was difficult for Public Works staff to proactively repair the infrastructure in a way that was cost-effective and went beyond fixing individual leaks or cracks. In 2012, the EPA, along with Tennessee’s state agencies, stepped in and demanded the complete rehabilitation and updating of the system.

Because the environmental risk posed by the continued sewage overflows was significant, the project was laden with timeline and performance benchmarks and metrics Memphis had to meet. The City also had to adopt an ongoing plan to assess and maintain the system’s health, with measures in place to respond to issues and emergencies.

Largely funded through rate revenues with additional funding made available through bonds and loans, the project was titled the Sewer Assessment and Rehabilitation Program. Over the course of 10 years and at a cost of $350 million, Memphis planned to completely modernize its entire sewer system to support its growing economy and population. The city defined three overarching definitions of program success: technical success, affordability, and local/minority or women-owned business participation that creates local jobs. Because of the enormity of the project, and the timeline and performance benchmarks demanded, Memphis needed an experienced partner to manage the program in line with its goals, and achieve regulatory compliance.

Solutions Used

Memphis has been able to keep the Sewer Assessment and Rehabilitation Program on track and reduce the frequency of sewer overflows with services including comprehensive program management and regulatory reporting.

Because of its past experience and large footprint as a company, Black & Veatch was chosen to provide Memphis with services throughout the project’s duration, including comprehensive program management services, public relations and community outreach, financial management, and regulatory reporting. Having started in 2013, the project is anticipated to be completed in 2023.

The city has used the project as an opportunity to invest in the community and enhance equity among contractors who may often get overlooked. In past projects, the city had typically set minority participation goals of 10%. Despite a small number of minority-owned firms capable of working with a scope of work so large, Black & Veatch entrusted over one-third of the sewer program work to minority- and women-owned businesses. These local contractors will bring value to the community by continuing much of the assessment and maintenance work to keep the sewer system healthy long into the future. The project’s completion will create a better way of life for Memphis residents through the elimination of sewage overflows, but also by establishing a sewer network resilient enough to support Memphis’ development and economic growth.

Before launching into the program, Memphis Public Works Director Robert Knecht admits, “we were struggling” to manage the wastewater system in a holistic way, using a Band-aid approach to fix issues with a system that had exceeded its life expectancy. Knecht sees the decree put forward by the EPA and Tennessee state regulators as an opportunity, “None of this would have happened if we hadn’t embarked on this consent decree program so we could be more strategic, more creative, more cost-efficient and cost-effective,” he added.

Under the new program, methods of identifying repair priorities have varied from using smoke to pinpoint cracked conduits to digitally mapping the entire system so that inspection details can be tagged to physical assets and viewed at a moment’s notice.

“It’s a good story. We’re cleaning the system, we’re assessing everything, and we’re starting to get a lot of big return on investments. Now comes the challenging part – trying to just keep driving home the last little bit that we can to keep getting those (overflow) numbers down.”- Scott Morgan, City of Memphis Senior Environmental Administrator

Because of the outsized cost of the project, keeping the project on track and on budget was crucial. To aid in that effort, a strong safety culture was cultivated. To ensure worker safety throughout the program’s 10-year duration, dozens of local supervisors and contractors received free training about such things as regulatory requirements, hazard mitigation, fall protection, and excavation and forklift safety.

Outcomes

1

Sewage overflows decreased by nearly 66%, lessening the health and environmental impacts of sewage leakage

2

Local minority and women-owned businesses have been selected to perform more than 1/3 of the project’s work, with more than 30 new careers created by the program

3

The entire sewer system was digitally mapped to make assessing and maintaining the system’s health easier in the future

4

Progress on the project has received a positive reception from regulatory agencies, including the EPA

5

Contractors and supervisors were given free training on safety topics to ensure minimal injuries while working on the project, resulting in over 900,000 work hours with no time lost

Who Should Consider

Towns or cities hampered in their economic development by foundational infrastructure systems whose scope make piecemeal repairs cost-prohibitive.

Last Updated

Mar 23rd, 2022

More resources about this case study

More Local Gov Case Studies from The Atlas Database
The Atlas case study database features examples of city projects – including both earth-moving projects and installed technologies – from around the world. You will not find proposed projects, or links to research studies and planning documents. There are 500+ member submitted case studies to browse - see related case studies to this one below:
Browse All Case Studies